Heat exchanger · Alterra Solutions engineering work
Bringing 380 °C gas down to 170 °C
We prepared the 3D model, technical drawings and heat calculation of a two-tower air-to-air heat exchanger. In a production plant it cools the hot, dusty gas leaving a furnace with outside air; the product the gas carries is then collected in a filter and bagged. The work was done in 2025 for an international tender.
In numbers
15 MW
Design heat duty: 65 kg of gas per second cooled from 380 °C to 170 °C.
1,440 tubes
Vertical tubes in eight modules, Ø108 mm, about 11 m long between the two tube sheets.
5,470 m²
Outer tube surface: the area through which heat passes from the gas to the air.
20 fans
In five rows, 18.5 kW each.
How does it work?
01
Gas comes from the furnace
Hot, dusty gas from the production furnace is ducted into the top of one tower of the exchanger.
02
Down one tower, up the other
The gas flows down through the tubes, turns around in the common hopper below and rises through the tubes of the other tower.
03
Air crosses from the side
Through 20 round openings on one face, fans push 25–35 °C outside air in; it passes between the very hot tubes and cools them. Gas and air never mix. The outlet temperature is set by the number of running fans.
04
The product is bagged
The cooled gas goes on to a bag filter. The product dust the filter collects is filled into bags.
Heat calculation
We sized the exchanger with the log mean temperature difference (LMTD) method. Design point: gas cooled to 170 °C with 20 fans at 32 °C outside air.
- Gas flow
- 430,000 m³/h (at 380 °C), about 65 kg/s
- Inlet / target outlet
- 380 °C / 170 °C
- Design outside air temperature
- 32 °C
- Heat duty
- 15.0 MW
- LMTD
- 227.0 K; crossflow correction F = 0.95
- Required UA (overall heat transfer coefficient × area)
- 69.6 kW/K
With the same calculation we tabulated the outlet temperature for 20–44 °C outside air and 12–20 fans. At 32 °C with 18 fans the gas leaves at 183 °C; only all 20 fans meet the target. On a 44 °C day, 20 fans give 177 °C.
The fans sit in panels of two. We estimated a panel's airflow from a power balance: with 2 × 18.5 kW shaft power, 220 Pa pressure rise and 60% efficiency, about 100 m³ of air per second (about 363,000 m³/h).
For project confidentiality, the values on this page have been changed; the method is the same. These are tender-stage estimates; in detailed design, wall and friction effects are taken into account with flow analysis (CFD).
What did we prepare?
3D CAD model
Two towers, eight tube modules, tube sheets, fan rings, inlet hoods and the bottom hopper. The model above was derived from it.
Technical drawings
General layout and dimensioned views, in AutoCAD.
Heat and fan calculation
LMTD sizing, an outlet temperature table by outside air and fan count, and a fan airflow estimate.
Parametric tube bundle
A Python (CadQuery) tool that reads tube count, layout, diameter and tube sheet dimensions from a file and generates a STEP assembly. When a dimension changes, the model is regenerated instead of redrawn by hand.
Where does it stand?
The work was prepared in 2025 for an international tender. Write to us for the model, calculation or interactive 3D presentation of similar equipment.